📍 Weatherford, TX | Parker County & DFWCall
Services/Pipeline Clearing

Pipeline ROW ClearingRight-of-Way Land Clearing Texas

Professional pipeline corridor clearing for oil & gas, water, and utility infrastructure. New construction and maintenance services statewide.

$5K-$35K

Per Mile

20-200 ft

ROW Widths

All Texas

Service Area

Maint.

Contracts Available

Pipeline Clearing Services

From initial construction to ongoing maintenance

New Pipeline Construction Clearing

Complete ROW clearing for new pipeline installation. Remove all vegetation to specified width, prep for pipe laying operations.

Applications: Oil & gas pipelines, water transmission lines, new utility corridors

ROW Maintenance Clearing

Regular maintenance clearing of existing pipeline corridors. Remove regrowth, keep access clear, maintain required setbacks.

Applications: Annual/bi-annual maintenance contracts, compliance clearing

Damage Prevention Clearing

Emergency or preventive clearing around pipeline infrastructure. Remove trees threatening lines, clear for inspections.

Applications: Hazard tree removal, inspection access, storm damage cleanup

Survey Line Clearing

Narrow corridor clearing for survey crews ahead of pipeline routing. Minimal width, maximum precision.

Applications: Pre-construction survey, route assessment, environmental study access

Pipeline Types We Clear

Oil & Gas Gathering Lines

Most common in Permian, Eagle Ford, Barnett

50-100 ft

Crude/NGL Transmission

Larger diameter, more stringent requirements

75-150 ft

Natural Gas Distribution

Urban to rural, varied terrain

30-75 ft

Water/Wastewater

Municipal and industrial water lines

30-100 ft

Electric Transmission

High voltage corridors, strict clearance

75-200 ft

Fiber Optic/Telecom

Narrow corridors, often co-located

20-50 ft

Why Choose Bear Claw for Pipeline Work?

Linear Efficiency

We specialize in linear clearing - our crews maintain consistent widths and minimize waste motion.

Regulatory Compliance

We understand pipeline clearance requirements and document our work for regulatory review.

Environmental Sensitivity

Trained in wetland avoidance, creek crossing protocols, and erosion control measures.

Safety First

Our operators are trained in energy industry safety standards and site protocols.

Volume Capacity

We can scale up crews and equipment for large pipeline projects with tight timelines.

Maintenance Programs

Ongoing maintenance contracts available to keep your ROW compliant year-round.

Equipment for Pipeline Clearing

Track Skid Steer with Mulcher

Primary clearing tool for most ROW work - handles brush and small trees efficiently.

Dozer with Root Rake

Heavy timber removal and root extraction for construction-ready corridors.

Excavator with Grapple

Large tree removal, stump extraction, and working in wet/soft conditions.

Brush Cutter/Boom Mower

Maintenance clearing and access to areas where tracked equipment can't reach.

Learn about our equipment →

Pipeline Clearing FAQs

Pipeline ROW clearing in Texas typically costs $5,000-$15,000 per mile for light to moderate vegetation, or $15,000-$35,000+ per mile for heavy timber. Costs depend on ROW width, vegetation density, terrain, and accessibility. Maintenance clearing is typically 40-60% less than initial clearing. We provide detailed per-mile quotes for pipeline projects.
We clear pipeline corridors from 20 feet (survey lines, fiber) up to 200+ feet (major transmission lines). Standard oil & gas gathering lines typically require 50-100 feet. We work to your specification and can adjust width for environmental features, existing infrastructure, or other constraints.
Clearing rates vary significantly with vegetation: Light brush: 3-5 miles/week per crew. Moderate brush/cedar: 1-3 miles/week. Heavy timber: 0.5-1 mile/week. Multiple crews can be deployed for urgent timelines. We provide realistic schedules based on your specific corridor conditions.
We support environmental compliance by: following specified erosion control measures, avoiding marked wetlands and sensitive areas, documenting clearing operations for regulatory review, and coordinating with environmental monitors on-site. We don't prepare environmental permits but work within permit conditions provided by your team.
Yes, we offer annual and multi-year ROW maintenance contracts. Regular maintenance (every 1-3 years depending on regrowth) keeps corridors compliant and costs less than letting vegetation re-establish. We can set up scheduled clearing or respond to as-needed requests.
We serve pipeline projects throughout Texas, with particular experience in the Permian Basin, Eagle Ford Shale, Barnett Shale, and Haynesville regions. We also handle projects in Central Texas, East Texas, and the Gulf Coast. Contact us with your project location for availability.

What Our Clients Say

Customer Reviews

What Our Customers Say

Don't just take our word for it - hear from our satisfied customers across Texas.

Ready to Discuss Your Pipeline Project?

Get a detailed quote for your ROW clearing project. We handle everything from survey lines to major transmission corridors.