Contact us for a Free Quote today(817) 435-4748
Solar Energy Site Prep

Solar Farm Clearing & Site Preparation in Texas

Specialized clearing and site preparation for utility-scale solar installations. We help Texas solar developers prepare sites for maximum energy production.

Texas Solar Market

Powering Texas's Clean Energy Future

Texas leads the nation in utility-scale solar development, with abundant land, excellent solar resources, and a business-friendly regulatory environment. Our team has the experience and equipment to prepare solar sites of any scale.

From community solar projects to utility-scale installations spanning thousands of acres, we understand the unique requirements of solar farm site preparation. We work with developers, EPC contractors, and utilities to deliver sites ready for panel installation.

#1
Texas ranks in U.S. solar growth
20+ GW
Solar capacity planned for Texas

Solar Farm Specialists

Utility-Scale Site Prep

Our Services

Complete Solar Farm Site Preparation

We handle every aspect of solar farm site preparation, from initial clearing to final grading and erosion control.

🌳

Vegetation Clearing

Complete removal of trees, brush, and vegetation across the project site. We use forestry mulching to minimize soil disturbance.

⚙️

Stump Removal

Grinding or removal of stumps below grade to prevent interference with panel foundations and mounting systems.

📐

Site Grading

Precision grading to achieve optimal slope for panel orientation, drainage, and mounting system requirements.

🛣️

Access Roads

Construction of primary access roads, internal service roads, and crane paths to project specifications.

🛡️

Erosion Control

Installation of silt fencing, erosion blankets, and sediment basins to meet environmental permit requirements.

🔒

Perimeter Clearing

Clearing for security fencing, perimeter roads, and buffer zones required by project design.

Why Bear Claw

Why Texas Solar Developers Choose Us

Utility-Scale Experience

We've prepared sites for some of Texas's largest solar installations. We understand the scale and timeline requirements of utility projects.

Scalable Resources

We can scale our equipment and crew to meet any project size and timeline. From 50 acres to 5,000+ acres.

Specification Compliance

We work from your specifications and coordinate with EPC contractors to ensure site prep meets all requirements.

On-Time Delivery

We understand that solar projects have tight timelines and interconnection deadlines. We deliver on schedule.

Environmental Compliance

We implement project-specific environmental measures and work within all permit requirements.

Competitive Pricing

We provide detailed, transparent pricing with volume discounts for large-scale solar projects.

Our Process

Solar Farm Site Prep Process

1

Site Survey

Review project specs, conduct site survey, identify challenges

2

Proposal

Detailed proposal with timeline, phasing, and pricing

3

Mobilization

Equipment and crew mobilization to project site

4

Execution

Clearing, grading, and site prep per specifications

5

Handoff

Final inspection and handoff to EPC contractor

FAQs

Solar Farm Clearing Questions

Solar farm clearing involves preparing land for utility-scale solar installations. This includes vegetation removal, stump grinding, grading to appropriate slope specifications, and erosion control measures. The goal is to create a stable, level surface suitable for solar panel mounting systems while minimizing soil disturbance.
Solar farm clearing costs in Texas typically range from $2,000 to $5,000 per acre depending on vegetation density, terrain, and grading requirements. Large utility-scale projects often receive volume pricing. We provide detailed quotes based on project specifications and site surveys.
Solar farm sites require specific grading for panel orientation and drainage, minimal soil compaction to prevent settling, erosion control measures, access road construction, and often perimeter fencing installation. We work closely with solar developers to meet exact specifications.
Yes, we have extensive experience with large-scale solar farm site preparation throughout Texas. We understand the specific requirements of solar developers, EPC contractors, and utility companies. Our equipment and crews are scaled for projects ranging from community solar to utility-scale installations.
Timeline depends on project size and complexity. A 50-100 acre solar farm typically requires 2-4 weeks for complete site preparation. Larger utility-scale projects of 500+ acres may take 2-3 months. We can scale our equipment and crews to meet project deadlines.
We serve solar farm projects throughout Texas, with a focus on West Texas, the Permian Basin, and the ERCOT grid region. We've completed projects from the Panhandle to South Texas. Our crews are mobile and can deploy to any Texas location.
We work within project environmental requirements and can implement specified erosion control, sediment management, and habitat protection measures. We coordinate with project environmental consultants to ensure compliance with permits and regulations.
Yes, access road construction is part of our solar farm site preparation services. We clear and grade primary access roads, internal service roads, and crane paths. Our roads meet the specifications required for solar panel delivery trucks and maintenance vehicles.

Ready to Start Your Texas Solar Project?

Contact us for a project consultation and detailed site preparation quote.