Wind Energy Site Clearing in Texas
Specialized land clearing and site preparation for wind energy projects. From turbine pads to access roads, we prepare Texas wind farms for construction.
The Wind Energy Capital of America
Texas produces more wind energy than any other state—and more than most countries. With vast open spaces, consistent wind resources, and transmission infrastructure, Texas continues to lead the nation in wind farm development.
Our team has prepared sites for wind projects across Texas, from the Panhandle to South Texas. We understand the unique requirements of wind farm construction and deliver sites ready for turbine installation.
Wind Farm Specialists
Turbine Site Preparation
Wind Farm Site Preparation Services
Comprehensive site preparation for all aspects of wind farm construction.
Turbine Pad Clearing
Clear and grade turbine foundation sites to exact specifications. Prepare lay-down areas for tower sections and components.
Access Road Construction
Build heavy-haul access roads capable of supporting blade trailers and crane mobilization. Meet turning radius requirements.
Crane Pad Preparation
Prepare crane staging areas and crane paths with proper compaction and load-bearing capacity for main assembly cranes.
Collection System Routes
Clear and prepare routes for underground electrical collection systems connecting turbines to substations.
O&M Building Sites
Prepare sites for operations and maintenance buildings, parking areas, and permanent access roads.
Substation Clearing
Clear and grade substation sites and switching station locations to project specifications.
Built for Wind Energy Scale
Access Road Specifications
We build access roads designed for the extreme loads of wind farm construction, including:
- 500,000+ lb load capacity
- 200+ foot turning radii for blade trailers
- All-weather surface preparation
- Proper drainage and culvert installation
Turbine Pad Requirements
We prepare turbine pad sites to meet foundation and crane requirements:
- Level pad areas for crane operation
- Component lay-down areas
- Proper soil compaction for foundations
- Crane walk path preparation
Wind Farm Site Prep Process
Coordination
Review project plans, coordinate with EPC and civil contractors
Mobilization
Deploy equipment and crews to project site
Execution
Build roads, clear pads, prepare all required areas
Handoff
Final inspection and turnover to civil contractor