🏗️ Developer Guide

Subdivision Development Land Clearing

The complete guide to land clearing for subdivision developers in Texas. From initial site assessment through lot delivery, learn how to plan and execute clearing that keeps your project on schedule and budget.

Updated: January 202616 min readFor developers & builders

Understanding Subdivision Clearing

Subdivision land clearing is more than just removing trees. It is a strategic process that must align with your development timeline, coordinate with civil engineering, comply with local regulations, and deliver buildable lots to your construction team.

The DFW metroplex is one of the fastest-growing regions in America, with thousands of new subdivision lots being developed each year. Successful developers know that efficient land clearing is critical to project timelines and profitability.

$2,000-$6,000
Per lot clearing cost
20-40%
Bulk discount available
2-4 weeks
Typical 20-lot project
15-25%
Lot value increase

Phases of Subdivision Clearing

Phase 1: Infrastructure ROW Clearing

First, clear corridors for roads, utilities, and drainage. This typically includes:

  • • Main road ROW (typically 50-60 feet wide)
  • • Utility easements (water, sewer, electric, gas)
  • • Stormwater detention/retention areas
  • • Entry features and common areas

Phase 2: Initial Lot Clearing

Clear the first phase of lots—typically those closest to infrastructure that will sell/build first:

  • • Complete lot clearing for building footprint
  • • Driveway approach clearing
  • • Utility lateral easements
  • • Strategic tree preservation (if specified)

Phase 3: Subsequent Phases

Clear additional lots as sales/contracts justify, typically in groups of 10-20:

  • • Coordinate with sales velocity
  • • Minimize time between clearing and construction
  • • Reduce carrying costs and regrowth management
Heavy equipment for subdivision land clearing

Our fleet includes equipment optimized for large-scale subdivision clearing projects

Subdivision Clearing Cost Breakdown

ComponentLight VegetationHeavy Vegetation
Individual lot (0.25-0.5 acre)$2,000-$3,500$4,000-$6,000
Bulk lots (10+ at once)$1,500-$2,500/lot$3,000-$4,500/lot
Road ROW (per linear foot)$3-$5/ft$5-$8/ft
Utility easements$2-$4/ft$4-$6/ft
Detention/retention areas (per acre)$2,500-$4,000$4,000-$6,000

Volume Pricing for Developers

We offer significant volume discounts for subdivision projects. A 50-lot development typically receives 25-35% discount off individual lot pricing. Contact us with your site plan for a detailed project quote.

Sample Project: 40-Lot Subdivision

40-Lot Residential Subdivision - Cost Example

Medium vegetation, 0.35 acre average lot size

Road ROW (2,400 linear feet @ $5/ft)$12,000
40 Lots cleared (bulk rate @ $2,800/lot)$112,000
Utility easements (1,200 ft @ $4/ft)$4,800
Detention pond area (2 acres @ $4,000)$8,000
Entry feature / common area$5,000
TOTAL PROJECT$141,800
($3,545 per lot all-in)

Phased vs. Complete Clearing

Complete Clearing

Clear entire subdivision at once.

✓ Lowest per-unit cost (maximum bulk discount)

✓ Single mobilization

✓ Consistent finished product

✗ Higher upfront cost

✗ May require regrowth maintenance

✗ Tied up capital before sales

Best for: Hot markets, smaller projects (<30 lots), developers with strong presales

Phased Clearing ✓

Clear in stages matching development pace.

✓ Lower upfront investment

✓ Better cash flow alignment

✓ Minimal regrowth between clear/build

✓ Flexibility if market shifts

⚠ Slightly higher per-lot cost

⚠ Multiple mobilizations

Best for: Larger projects, uncertain markets, capital-conscious developers

Tree Preservation Strategy

Strategic tree preservation can increase lot values by 5-15% and improve marketability. However, it must be carefully planned to avoid construction conflicts.

Tree Preservation Guidelines

Preserve
  • • Specimen oaks >24" diameter
  • • Mature pecans in good condition
  • • Tree clusters in common areas
  • • Trees along property boundaries
Clear
  • • ALL trees in building footprints
  • • Trees within 10 ft of foundations
  • • Cedar/juniper (low value, high spread)
  • • Dead, diseased, or hazard trees

Permit Requirements

Subdivision clearing in the DFW area typically requires various permits. Requirements vary significantly by jurisdiction:

Permit TypeWhen RequiredTypical Cost
Land Disturbance PermitSites >1 acre in most cities$500-$2,000
Tree Removal PermitCities with tree ordinances$100-$1,000
SWPPPAll sites >1 acre$2,000-$5,000
Grading PermitIf significant grading included$500-$2,500

Tips for Developers

1

Get Clearing Bids Early

Include clearing costs in your land acquisition analysis. A heavily wooded site may cost $100K+ more to clear than open pasture.

2

Coordinate with Civil Engineering

Share your civil plans with your clearing contractor. We can clear exactly to final grade elevations, reducing subsequent earthwork.

3

Schedule During Dry Season

Clearing is most efficient October-March in Texas. Wet conditions slow progress and can cause soil compaction issues.

4

Build Relationships

Work with the same clearing contractor across projects. Established relationships mean better pricing, priority scheduling, and crews who know your standards.

Frequently Asked Questions

Subdivision lot clearing typically costs $2,000-$6,000 per lot depending on lot size (typically 0.25-0.5 acre) and vegetation density. Bulk clearing of multiple lots reduces per-lot cost by 20-40%. Infrastructure ROW clearing adds $50,000-$150,000+ depending on road length and utility requirements.
Phased clearing is typically recommended for subdivisions over 20 lots. Clear infrastructure ROW and first-phase lots initially, then clear additional phases as sales progress. This reduces upfront cost, minimizes regrowth management, and allows flexibility in development timing.
Requirements vary by jurisdiction. Common permits include: municipal land disturbance permits, tree removal permits (in cities with tree ordinances), SWPPP (Stormwater Pollution Prevention Plan) for sites over 1 acre, and any specific county or ETJ requirements. We recommend checking with the local planning department before clearing.
Timeline depends on size and vegetation: 20-lot subdivision with moderate brush: 2-4 weeks for complete clearing. 50-100 lot subdivision: 4-8 weeks. Large developments (100+ lots): 2-3 months. Add time for weather delays during rainy seasons.
Strategic tree preservation increases lot values and marketability. Preserve specimen trees (large oaks, pecans) and create tree clusters in common areas. However, clear trees from actual building footprints—it is cheaper to clear now than work around trees during construction.
Lot clearing typically includes: complete vegetation removal from building footprint, driveway access clearing, utility easement clearing, and grading as specified. Additional services like stump grinding, topsoil preservation, and enhanced grading are available but may cost extra.